TVS Emerald Auralis
By TVS Emerald in Kattigenahalli, Bengaluru, 560064
- Status
- Under construction
- Type
- Residential
- Locality
- Kattigenahalli
- RERA completion
- 30 Jun 2030
- Total homes
- 393
- Last verified
- 1 Oct 2026
Summary
Approvals and checks: 10 clear, 2 to check, 0 problems. See the full list.
Construction is 41% complete as of 30 Jun 2026.
Project facts
- Type
- Residential
- RERA number
- PRM/KA/RERA/1251/472/PR/110925/008087
- Project start (per RERA)
- 1 Sept 2025
- Promised possession
- Not available
- RERA completion date
- 30 Jun 2030
- RERA extension
- No extension recorded
- Commencement certificate (CC)
- Not on RERA
- Occupancy certificate (OC)
- Not yet due
- Land area
- 3.71 acres106 homes per acre
- Open area
- 71.8% of the site
- FAR sanctioned
- 3
Location
Kattigenahalli, Bengaluru, 560064
Approvals and checks
10 clear, 2 to check, 0 problems
- ✓RERA registrationRegistered
- ✓Building planApproved by BBMP
- !Commencement certificateNot uploaded on RERA
- –Occupancy certificateDue at completion
- ✓Environmental clearanceFiled on RERA
- ✓Fire NOCFiled on RERA
- ✓Airport height (AAI)Filed on RERA
- ✓Defence clearance (IAF)Filed on RERA
- ✓Draft sale agreementPublished on RERA
- ✓Land litigationNone declared by promoter
- ✓Land ownershipPromoter's own land
- ✓KhathaE Khatha
- !Court-records checkPending
Legal cases
As declared by the promoter on RERA: no litigation on the land, khatha or project, with a non-litigation affidavit and an advocate search report uploaded. One RERA complaint is pending against the project: a buyer's request, filed 30 Jan 2026, for a full refund of the booking amount, citing alleged misrepresentation of loan eligibility. It is posted for orders before Authority Bench 4. Last checked: 1 Oct 2026.
Legal check not done yet. We have not completed a court-records check for this project.
RERA complaints
1 complaint on this project, 1 still pending.
What complaints were about
One complaint can raise several issues, so issues add up to more than the number of complaints.
By year filed
Disposed Pending
See all 1 complaint
- Full refund of booking amount; alleged misrepresentation of loan eligibility and unfair trade practice (Sections 12 and 18)
Construction and sales
From the promoter’s latest RERA filing, as of 30 Jun 2026.
By tower
Construction complete Homes sold
Over time
Construction complete Homes sold
- Collected from buyers
- Rs 24.32 Cr
- Withdrawn from the RERA account
- Rs 30 Cr
- Total project cost (as declared on RERA)
- Rs 450.1 Cr
- Quarterly updates
- Up to dateLatest filed 13 Jul 2026
Construction timeline
Bars show the promoter’s planned dates on RERA. The vertical line is today. Colour shows progress from the promoter’s latest RERA filing.
RERA items combined: earthwork and levelling; foundation footing. As of Jun 2026: earthwork 85% and foundation footing 75% complete, both past their planned end dates (28 Dec 2025 and 27 Feb 2026).
RERA items combined: retaining wall; up to plinth level; sub-structure flooring (parking floors). As of Jun 2026: retaining wall 13%, plinth level 50%, sub-structure flooring 0%. Retaining wall and plinth were due to finish by 10 Apr and 27 May 2026.
RERA items combined: RCC or MS framed structure; masonry construction. As of Jun 2026: RCC frame 20% (planned 5 Jan 2026 to 28 Jul 2027), masonry 0%. Slabs are complete to the 3rd floor in Tower A and the 6th floor in Tower C.
RERA items combined: basic water, sanitary and electrical work; plastering; joinery; flooring and tiles; railing; finishing fittings; painting; fire fittings; weatherproofing; elevation. As of Jun 2026: all at 0%.
Internal and external works including landscaping. As of Jun 2026: 0% on landscaping, external infrastructure and amenities. Planned to finish on the RERA completion date, 30 Jun 2030, with no buffer.
Completed In progress Not started
Units
- Total homes
- 393
- Towers
- 6
- Floors (tallest tower)
- 12
- Unit types
- 1 BHK, 2 BHK, 3 BHK
- Unit sizes (carpet area)
- 505 to 1,122 sq ft
- Unit mix
- 3 BHK: 218; 2 BHK: 174; 1 BHK: 1
Price
- Price range
- Not available
- Price per sq ft
- Not available
Parking
- Covered parking
- 352 spaces0.9 spaces per home
Amenities
- Clubhouse
- Swimming pool
- Gym
- Indoor sports
- Outdoor sports
- Parks
- CCTV
- Power backup
- Sewage treatment plant
- Rainwater harvesting
- Renewable energy
Living here
- Water source
- BWSSB, Tanker
- Piped gas
- No
- Kitchen cabinets and wardrobes
- Not included, buyer fits them
- Clubhouse
- 9,029 sq ft23 sq ft per home
Promoter and land
- Builder (brand)
- TVS Emerald
- Registered promoter
- Emerald Haven Residences Private Limited
- Land owner
- Emerald Haven Residences Private Limited
- Land arrangement
- Own land
Promoter complaints
- Complaints on the promoter (total)
- 1
- Complaints on the promoter (pending)
- 1
Sources
Karnataka RERA project page for TVS Emerald Auralis (promoter, land, project, tower, schedule, vendor and document tabs; checked 1 Oct 2026; registration approved 11 Sep 2025) and its Q3 2025-26, Q4 2025-26 and Q1 2026-27 quarterly updates (filed 10 Feb, 5 May and 13 Jul 2026; latest progress as of 30 Jun 2026).
Things to know
- The launch date is the project start date declared on RERA.
- The commencement certificate is not uploaded on RERA; that slot holds the BBMP building licence (BBMP/CC/8683/25-26), issued 30 Aug 2025 and valid for two years from that date.
- RERA lists 352 covered and 93 open parking spaces (445), but the tower-level figures give one space per flat (393).
- Land area is the RERA total of 15,023 sq m (3.71 acres); the two sale deeds list about 3.88 acres in total, and a relinquishment deed is also uploaded.
- The amenity tick-boxes on RERA are inconsistent (indoor sports, outdoor sports and parks are marked No, while a squash court, basketball court, tennis court and jogging track are listed), so amenities follow the specific items listed.
- Other declared amenities outside the standard list: banquet hall, mini theatre, co-working space, conference room, party lawn, aroma garden, games and cards rooms, kids' play area, gazebo.
- The promoter is a 2023 company with no earlier K-RERA projects.
- The overall completion figure of 41% equals the share of the engineer-certified construction cost spent (Rs 71.4 Cr of Rs 173.8 Cr; 14% and 39% in the two previous quarters on the same basis); progress by tower is lower, from 2% to 24%.
- The 'actual' start dates in the quarterly update are identical to the planned dates, including for works not yet started, so only the percentage complete is used.
- Buyer advances and RERA account withdrawals reported for Q1 2026-27 (Rs 24.32 Cr and Rs 30.00 Cr) are well below the Q4 2025-26 filing (Rs 161.14 Cr and Rs 68.50 Cr), so the two filings appear to use different bases.
- RERA complaints are as listed on the K-RERA complaints tab, checked 1 Oct 2026.
- The promoter has no other K-RERA projects.
Verification
Last verified 1 Oct 2026