Sobha Magnus
By Sobha in Kothanur, Uttarahalli Hobli (Bengaluru South), Bengaluru, 560076
- Status
- Under construction
- Type
- Residential
- Locality
- Kothanur, Uttarahalli Hobli (Bengaluru South)
- RERA completion
- 31 May 2030
- Total homes
- 294
- Last verified
- 14 Oct 2026
Summary
Approvals and checks: 9 clear, 2 to check, 0 problems. See the full list.
Construction is 10% complete as of 30 Sept 2026.
Project facts
- Type
- Residential
- RERA number
- PRM/KA/RERA/1251/310/PR/131025/008160
- Project start (per RERA)
- 1 Oct 2025
- Promised possession
- Not available
- RERA completion date
- 31 May 2030
- RERA extension
- No extension recorded
- Commencement certificate (CC)
- Not on RERA
- Occupancy certificate (OC)
- Not yet due
- Land area
- 5.85 acres50 homes per acre
- Open area
- 77.9% of the site
- FAR sanctioned
- 2.25
Location
Kothanur, Uttarahalli Hobli (Bengaluru South), Bengaluru, 560076
Approvals and checks
9 clear, 2 to check, 0 problems
- ✓RERA registrationRegistered
- ✓Building planApproved by BBMP
- !Commencement certificateNot uploaded on RERA
- –Occupancy certificateDue at completion
- ✓Environmental clearanceFiled on RERA
- ✓Fire NOCFiled on RERA
- ✓Airport height (AAI)Filed on RERA
- –Defence clearance (IAF)Not listed on RERA
- ✓Draft sale agreementPublished on RERA
- ✓Land litigationNone declared by promoter
- ✓Land ownershipPromoter's own land
- ✓KhathaE Khatha
- !Court-records checkPending
Legal cases
No litigation is declared on the land or the project on RERA (registration tabs, checked 14 Oct 2026).
Legal check not done yet. We have not completed a court-records check for this project.
Construction and sales
From the promoter’s latest RERA filing, as of 30 Sept 2026.
By tower
Construction complete Homes sold
Over time
Construction complete Homes sold
- Collected from buyers
- Rs 29.39 Cr
- Withdrawn from the RERA account
- Rs 29.04 Cr
- Total project cost (as declared on RERA)
- Rs 619.28 Cr
- Quarterly updates
- Up to dateLatest filed 14 Oct 2026
Construction timeline
Bars show the promoter’s planned dates on RERA. The vertical line is today. Colour shows progress from the promoter’s latest RERA filing.
70% complete
60% complete
0% complete
0% complete
4% complete
0% complete
0% complete
0% complete
0% complete
0% complete
0% complete
0% complete
0% complete
0% complete
0% complete
0% complete
0% complete
Completed In progress Not started
Units
- Total homes
- 294
- Towers
- 5
- Floors (tallest tower)
- 9
- Unit types
- 2 BHK, 3 BHK, 4 BHK
- Unit sizes (carpet area)
- 824 to 1,771 sq ft
- Unit mix
- 3 BHK: 252; 4 BHK: 38; 2 BHK: 4
Price
- Price range
- Not available
- Price per sq ft
- Not available
Parking
- Covered parking
- 514 spaces1.75 spaces per home
Amenities
- Clubhouse
- Indoor sports
- Gym
- Power backup
Living here
- Water source
- Tanker
- Piped gas
- No
- Kitchen cabinets and wardrobes
- Not stated
- Clubhouse
- 12,761 sq ft43 sq ft per home
Promoter and land
- Builder (brand)
- Sobha
- Registered promoter
- Sobha Limited
- Land owner
- Sobha Limited
- Land arrangement
- Own land
Sources
Karnataka RERA project page PRM/KA/RERA/1251/310/PR/131025/008160 (registration tabs and the quarterly updates for Q3 2025-26, Q4 2025-26, Q1 2026-27 and Q2 2026-27, checked 14 Oct 2026).
Things to know
- The launch date is the project start date declared on RERA (1 Oct 2025); the project is a new launch registered under the BBMP-approved plan BBMP/Addl.Dir/JDSOUTH/0026/25-26 (10 Oct 2025).
- RERA lists five wings in three blocks, each of 9 floors with 2 basements.
- Sy. nos. 87/2 and 87/3 are own land of Sobha Limited (sale deed 4 Jun 2015); no JDA; E-Khatha 7863600645; the promoter's non-litigation declaration is uploaded and no land litigation is declared.
- The land abuts portions acquired for BMRCL (metro), as stated in the boundary schedule.
- The commencement certificate slot holds a file named 'Commencement Certificate BDA Work Order' and a clarification on the commencement certificate is uploaded, so the commencement certificate is shown as not on RERA.
- A BBMP building licence and the BBMP building plan (both 10 Oct 2025) are in the uploaded documents; RERA approved the registration on 13 Oct 2025.
- Unit sizes are the carpet areas in the RERA unit list: 252 units of 3 BHK (94 to 146 sq m), 38 of 4 BHK (165 sq m) and 4 of 2 BHK (77 sq m).
- RERA lists 514 covered, 5 open and 2 garage parking spaces.
- Source of water is tankers.
- Land area is the total area of land declared (23,669 sq m).
- Progress as filed was 3% (Q3 2025-26), 7% (Q4 2025-26), 9% (Q1 2026-27) and 10% (Q2 2026-27, filed 14 Oct 2026); all five wings are at 0% in the tower-level figures.
- The 'total collected' figure as filed falls every quarter (Rs 80.59 Cr, Rs 44.63 Cr, Rs 36.70 Cr, Rs 29.39 Cr), and the amount withdrawn is Rs 49.86 Cr, Rs 57.14 Cr, Rs 33.05 Cr and Rs 29.04 Cr; figures are shown as filed.
- In the Q2 2026-27 schedule the actual start of earth work reads 6 Nov 2026, a date after the filing; the Q3 2025-26 update reads 6 Nov 2025.
- The contractor listed on RERA is the promoter itself.
- The Complaints tab was not checked, so complaint counts are blank.
- Kitchen cabinets and wardrobes are not stated on RERA.
- Quarterly update compliance for earlier quarters not reviewed.
Verification
Last verified 14 Oct 2026