Approvals and checks: 6 clear, 2 to check, 1 problem. See the full list.
Construction is 100% complete as of 31 Mar 2026.
Project facts
- Type
- Residential
- RERA number
- PRM/KA/RERA/1251/446/PR/200121/003218
- Project start (per RERA)
- 18 Dec 2019
- Promised possession
- Not available
- RERA completion date
- 30 Sept 2026
- RERA extension
- Extended till 30 Sept 2026
- Commencement certificate (CC)
- Not on RERA
- Occupancy certificate (OC)
- Not on RERA
- Land area
- 5.47 acres65 homes per acre
- Open area
- 88.8% of the site
- FAR sanctioned
- Not available
Location
Balagere, Varthur Hobli (Bengaluru East), Bengaluru
Approvals and checks
6 clear, 2 to check, 1 problem
- ✓RERA registrationRegistered
- ✓Building planApproved by BBMP
- !Commencement certificateNot uploaded on RERA
- ✕Occupancy certificateNot on RERA
- ✓Environmental clearanceFiled on RERA
- ✓Fire NOCFiled on RERA
- ✓Airport height (AAI)Filed on RERA
- –Defence clearance (IAF)Not listed on RERA
- –Draft sale agreementNot recorded
- –Land litigationNot stated
- ✓Land ownershipPromoter's own land
- –KhathaNot stated
- !Court-records checkPending
Legal cases
RERA's Complaints tab (checked 24 Oct 2026) lists 2 complaints on this project: one disposed by the Authority (Bench 4) and one filed on 27 May 2025 (additional benefit not provided as promised) posted for orders before Bench 4.
Legal check not done yet. We have not completed a court-records check for this project.
RERA complaints
2 complaints on this project, 1 still pending.
What complaints were about
One complaint can raise several issues, so issues add up to more than the number of complaints.
By year filed
Disposed Pending
See all 2 complaints
- Additional benefit promised was not provided
- Refund of the full token advance (Rs 99,000)
Construction and sales
From the promoter’s latest RERA filing, as of 31 Mar 2026.
By tower
Construction complete Homes sold
Over time
Construction complete Homes sold
- Collected from buyers
- Rs 0.04 Cr
- Withdrawn from the RERA account
- Rs 0.04 Cr
- Total project cost (as declared on RERA)
- Rs 170.05 Cr
Construction timeline
Bars show the promoter’s planned dates on RERA. The vertical line is today. Colour shows progress from the promoter’s latest RERA filing.
100% complete
100% complete
100% complete
100% complete
100% complete
100% complete
100% complete
100% complete
100% complete
100% complete
100% complete
100% complete
100% complete
100% complete
Completed In progress Not started
Units
- Total homes
- 356
- Towers
- 4
- Floors (tallest tower)
- 15
- Unit types
- Flats
- Unit sizes (carpet area)
- Not available
- Unit mix
- Flats: 356
Price
- Price range
- Not available
- Price per sq ft
- Not available
Parking
- Covered parking
- Not available
Amenities
Not available
Living here
- Water source
- Not available
- Piped gas
- Not available
- Kitchen cabinets and wardrobes
- Not available
- Clubhouse
- Not available
Promoter and land
- Builder (brand)
- Sobha
- Registered promoter
- Sobha Limited
- Land owner
- Not available
- Land arrangement
- Own land
Promoter complaints
- Complaints on the promoter (total)
- 226
- Complaints on the promoter (pending)
- Not available
Sources
Karnataka RERA project page PRM/KA/RERA/1251/446/PR/200121/003218 (registration details, Uploaded Documents tab and the quarterly updates for Q3 2025-26 and Q4 2025-26, checked 24 Oct 2026).
Things to know
- This record covers Phase 27 as registered on RERA (Wings 55 to 58) of the Sobha Dream Acres development at Balagere.
- The launch date is the project start date declared on RERA (18 Dec 2019).
- The completion date at registration was 31 Dec 2025, extended to 30 Sep 2026 under the Covid extension, which has now passed.
- RERA lists 356 flats (60 each in Wings 55 and 57, 118 each in Wings 56 and 58) with a total carpet area of 23,536 sq m; unit sizes were not captured.
- Each wing has 15 levels (ground plus 14 floors).
- All 356 flats are shown as booked in the quarterly updates.
- Both quarterly updates (Q3 2025-26 filed 12 Jan 2026, Q4 2025-26 filed 9 Apr 2026) report 100% completion, every wing and every schedule item at 100%, with collections of Rs 0.07 Cr and Rs 0.04 Cr and withdrawals of Rs 0.07 Cr and Rs 0.04 Cr (Rs 4.06 lakh collected against Rs 4.06 lakh withdrawn in Q4).
- No Q1 or Q2 2026-27 update was seen.
- Status is shown as Ready to move because the project is reported fully built and sold, but the Completion Details tab was not seen, so the occupancy certificate is not confirmed.
- A BBMP plan sanction letter is uploaded in the commencement slot, so the commencement certificate is shown as not on RERA, and the validity of the sanction letter was clarified on 10 Jan 2020.
- The JDA slot reads Not Applicable and no land owners are listed on RERA, so the land is shown as own land.
- Land area is the total area declared (22,121 sq m); open area is 19,634 sq m.
- Total project cost is Rs 170.05 Cr: construction Rs 135.71 Cr plus land Rs 34.33 Cr. 36 parking spaces are declared for sale.
- Fire, AAI/HAL, BESCOM, BWSSB, KSPCB and SEIAA NOCs are uploaded.
- Water, fire fighting and BESCOM works are listed as local authority.
- RERA's Complaints tab (checked 24 Oct 2026) shows 2 complaints on this project (1 disposed, 1 posted for orders) and 226 on the promoter; how many of those are pending is not shown.