Prestige Suncrest
By Prestige Group in Tirupalya, Jigani Hobli, Anekal Taluk, Bengaluru, 560099
- Status
- Under construction
- Type
- Residential
- Locality
- Tirupalya, Jigani Hobli, Anekal Taluk
- RERA completion
- 30 Sept 2028
- Total homes
- 437
- Last verified
- 24 Oct 2026
Summary
Approvals and checks: 6 clear, 4 to check, 0 problems. See the full list.
Construction is 21% complete as of 30 Sept 2026.
Project facts
- Type
- Residential
- RERA number
- PRM/KA/RERA/1251/308/PR/170225/007512
- Project start (per RERA)
- 1 Apr 2025
- Promised possession
- Not available
- RERA completion date
- 30 Sept 2028
- RERA extension
- No extension recorded
- Commencement certificate (CC)
- Not on RERA
- Occupancy certificate (OC)
- Not yet due
- Land area
- 5.87 acres74 homes per acre
- Open area
- 61.1% of the site
- FAR sanctioned
- 2.49
Location
Tirupalya, Jigani Hobli, Anekal Taluk, Bengaluru, 560099
Approvals and checks
6 clear, 4 to check, 0 problems
- ✓RERA registrationRegistered
- ✓Building planApproved by BDA
- !Commencement certificateNot uploaded on RERA
- –Occupancy certificateDue at completion
- –Environmental clearanceNot listed on RERA
- !Fire NOCNot listed on RERA
- ✓Airport height (AAI)Filed on RERA
- –Defence clearance (IAF)Not listed on RERA
- ✓Draft sale agreementPublished on RERA
- ✓Land litigationNone declared by promoter
- !Land ownershipJoint development with landowners
- ✓KhathaE Khatha
- !Court-records checkPending
Legal cases
RERA's Complaints tab (checked 24 Oct 2026) shows no complaints on this project.
Legal check not done yet. We have not completed a court-records check for this project.
RERA complaints
No complaints recorded on this project.
Construction and sales
From the promoter’s latest RERA filing, as of 30 Sept 2026.
By tower
Construction complete Homes sold
Over time
Construction complete Homes sold
- Collected from buyers
- Rs 20.1 Cr
- Withdrawn from the RERA account
- Rs 20.56 Cr
- Total project cost (as declared on RERA)
- Rs 558.57 Cr
Construction timeline
Bars show the promoter’s planned dates on RERA. The vertical line is today. Colour shows progress from the promoter’s latest RERA filing.
100% complete
100% complete
100% complete
0% complete
75% complete
14% complete
0% complete
0% complete
0% complete
0% complete
0% complete
0% complete
0% complete
0% complete
0% complete
0% complete
0% complete
0% complete
Completed In progress Not started
Units
- Total homes
- 437
- Towers
- 2
- Floors (tallest tower)
- 26
- Unit types
- 1 BHK; 2 BHK; 3 BHK
- Unit sizes (carpet area)
- 420 to 1,155 sq ft
- Unit mix
- 1 BHK: 49; 2 BHK: 96; 3 BHK: 292
Price
- Price range
- Not available
- Price per sq ft
- Not available
Parking
- Covered parking
- 580 spaces1.33 spaces per home
Amenities
- Club house
- Community hall
- Outdoor sports
- Indoor sports
- Swimming pool
- Gym
- Parks
- Power backup
- CCTV
Living here
- Water source
- Borewell
- Piped gas
- No
- Kitchen cabinets and wardrobes
- Not included, buyer fits them
- Clubhouse
- 23,067 sq ft53 sq ft per home
Promoter and land
- Builder (brand)
- Prestige Group
- Registered promoter
- Prestige Estates Projects Limited
- Land owner
- Trishul Buildtech & Infrastructures Pvt Ltd (JDA)
- Land arrangement
- Joint development (JDA)
Promoter complaints
- Complaints on the promoter (total)
- 77
- Complaints on the promoter (pending)
- Not available
Sources
Karnataka RERA project page PRM/KA/RERA/1251/308/PR/170225/007512 (registration details, Uploaded Documents and Complaints tabs, and the quarterly updates for Q3 2025-26, Q4 2025-26, Q1 2026-27 and Q2 2026-27, checked 24 Oct 2026).
Things to know
- The project start date declared on RERA (1 Apr 2025) is shown as the launch date.
- RERA lists 437 apartments in two towers: Tower-01 with 224 units and 26 floors (27 levels counting the ground level) and Tower-02 with 213 units and 25 floors; each also has one basement.
- Unit mix as registered is 49 one-bedroom (about 39 sq m carpet), 96 two-bedroom (about 66 to 70 sq m) and 292 three-bedroom (about 82 to 107 sq m), matching the total of 437.
- Smallest and largest carpet areas are taken from the unit-wise list.
- The land is under a Joint Development Agreement (registered 26 Oct 2023) with Trishul Buildtech & Infrastructures Pvt Ltd across Sy.
- Nos. 30/24B, 30/24C, 30/25 and 30/25B at Tirupalya village; the khatha is an E Khatha issued by the Nagarasabhe, Hebbagodi (5 Jan 2024), and the promoter declares no land litigation (no-litigation affidavit uploaded).
- The plan was approved by BDA on 15 Jan 2025 (plan number BDA/No./AS/AA-3/TS-2/D/18/2024-25).
- The commencement certificate slot holds the BDA development plan work order rather than a certificate, so it is shown as not on RERA.
- The occupancy certificate is not yet due (RERA completion 30 Sep 2028).
- Land area is the total area declared (23,738 sq m: 14,501 open and 9,237 covered). 580 covered and 33 open parking spaces are declared.
- Total project cost is Rs 558.57 Cr: land Rs 218.08 Cr plus layout development Rs 340.49 Cr.
- FAR sanctioned is 2.49.
- Source of water is borewell and the Nagarasabha at Hebbagodi (panchayat water NOC uploaded).
- Uploaded NOCs: BESCOM electricity, panchayat water, Airport Authority of India height clearance and a KSPCB/SEIAA acknowledgement.
- The pollution board and environmental items are acknowledgements of an application (Revised SEIAA application), not clearances, so they are not listed as received.
- Fire NOC is marked NA in the NOC section although a file named Fire NOC is in the uploaded documents, so it is not listed.
- Progress as filed was 22% (Q3 2025-26), 25% (Q4 2025-26), 34% (Q1 2026-27) and 21% (Q2 2026-27, filed 14 Oct 2026).
- The overall figure fell 13 points between the last two filings while the tower figures rose (Tower-01 top-floor entry 11% to 24%, Tower-02 13% to 19%); both are shown as filed.
- Sub-structure items are at 100% except sub-structure flooring (0%) and the retaining wall (75%, planned end 14 Sep 2025).
- The RCC frame is at 14% against a planned window of 1 Oct 2025 to 31 Mar 2027, and masonry (planned start 1 Apr 2026), plastering, water and electrical basic work, and railings (all planned to have started) are at 0%, so construction is shown as behind schedule.
- All 437 homes are shown as booked in every quarterly update, from the first filing, at 21% to 34% progress.
- The amount withdrawn from the RERA account was higher than the amount collected in Q3 2025-26 (Rs 31.01 Cr against Rs 29.84 Cr), Q1 2026-27 (Rs 33.89 Cr against Rs 30.89 Cr) and Q2 2026-27 (Rs 20.56 Cr against Rs 20.10 Cr), as filed, and slightly lower in Q4 2025-26 (Rs 13.72 Cr against Rs 13.85 Cr).
- The Completion Details and Enquired Documents tabs were not seen.
- RERA's Complaints tab (checked 24 Oct 2026) shows no complaints on this project and 77 on the promoter; how many of those are pending is not shown.
- Quarterly update compliance for earlier quarters not reviewed.
Verification
Last verified 24 Oct 2026