Prestige Camden Gardens
By Prestige Group in Jakkur, Bengaluru, 560064
- Status
- Under construction
- Type
- Residential
- Locality
- Jakkur
- RERA completion
- 31 Dec 2027
- Total homes
- 117
- Last verified
- 11 Oct 2026
Summary
Approvals and checks: 10 clear, 2 to check, 0 problems. See the full list.
Construction is 45% complete as of 15 Jul 2026.
Project facts
- Type
- Residential
- RERA number
- PRM/KA/RERA/1251/472/PR/140524/006872
- Project start (per RERA)
- 1 Jul 2024
- Promised possession
- Not available
- RERA completion date
- 31 Dec 2027
- RERA extension
- No extension recorded
- Commencement certificate (CC)
- Received
- Occupancy certificate (OC)
- Not yet due
- Land area
- 1.7 acres69 homes per acre
- Open area
- 82% of the site
- FAR sanctioned
- 3
Location
Jakkur, Bengaluru, 560064
Approvals and checks
10 clear, 2 to check, 0 problems
- ✓RERA registrationRegistered
- ✓Building planApproved by BBMP
- ✓Commencement certificateReceived
- –Occupancy certificateDue at completion
- ✓Environmental clearanceFiled on RERA
- ✓Fire NOCFiled on RERA
- ✓Airport height (AAI)Filed on RERA
- ✓Defence clearance (IAF)Filed on RERA
- ✓Draft sale agreementPublished on RERA
- ✓Land litigationNone declared by promoter
- !Land ownershipJoint development with landowners
- ✓KhathaA Khatha
- !Court-records checkPending
Legal cases
Promoter declares no litigation on the land, property or khatha or on the project (joint no-litigation affidavit on RERA). Court records not yet checked independently.
Legal check not done yet. We have not completed a court-records check for this project.
RERA complaints
No complaints recorded on this project.
Construction and sales
From the promoter’s latest RERA filing, as of 15 Jul 2026.
By tower
Construction complete Homes sold
Over time
Construction complete Homes sold
- Collected from buyers
- Rs 12.39 Cr
- Withdrawn from the RERA account
- Rs 12.13 Cr
- Total project cost (as declared on RERA)
- Rs 217.97 Cr
- Quarterly updates
- Up to dateLatest filed 15 Jul 2026
Construction timeline
Bars show the promoter’s planned dates on RERA. The vertical line is today. Colour shows progress from the promoter’s latest RERA filing.
Filed at 0% although the tower is reported 31% complete
Filed at 0% although the tower is reported 31% complete
Planned end date has passed and filed at 0%
Completed In progress Not started
Units
- Total homes
- 117
- Towers
- 1
- Floors (tallest tower)
- 20
- Unit types
- 1 BHK, 3 BHK, 4 BHK
- Unit sizes (carpet area)
- 517 to 1,746 sq ft
- Unit mix
- 1 BHK: 1, 3 BHK: 96, 4 BHK: 20 (117 in total)
Price
- Price range
- Not available
- Price per sq ft
- Not available
Parking
- Covered parking
- 178 spaces1.52 spaces per home
Amenities
- Club house
- Community hall
- Outdoor sports
- Indoor sports
- Swimming pool
- Gym
- Parks
- Power backup
- CCTV
Living here
- Water source
- Borewell, BWSSB
- Piped gas
- No
- Kitchen cabinets and wardrobes
- Not included, buyer fits them
- Clubhouse
- Not available
Promoter and land
- Builder (brand)
- Prestige Group
- Registered promoter
- PRESTIGE ESTATES PROJECTS LTD
- Land owner
- Asma Nadeem Ahmed
- Land arrangement
- Joint development (JDA)
Promoter complaints
- Complaints on the promoter (total)
- 77
- Complaints on the promoter (pending)
- Not available
Sources
K-RERA project registration record (approved 14-05-2024), the K-RERA quarterly updates for Q3 2025-26, Q4 2025-26 and Q1 2026-27 (filed 15-07-2026), and the K-RERA complaints tab.
Things to know
- The promoter is Prestige Estates Projects Limited, and the project is a single tower of two basements, ground and 20 upper floors with 117 homes, in Thirumenahalli village, BBMP Ward 5, Jakkur.
- The land is held under a joint development agreement registered on 17-05-2023 with the landowner, whose share is shown as 34%, with an A Khatha dated 06-07-2023 and a BBMP plan approved on 08-04-2024.
- The promoter has declared no litigation on the land, property or khatha or on the project.
- All 117 homes have been shown as booked since the Q3 update, and they are one 1 BHK, 96 three-BHK and 20 four-BHK homes.
- The reported project completion went from 48% in Q3 to 83% in Q4 and back to 45% in Q1, while the tower itself was reported at 18%, 22% and 31%, so the project-level percentage is not reliable.
- All the super-structure items, including RCC framing and masonry, are still filed at 0% in Q1 although the tower is 31% complete, and basic water, sanitary and electrical work was due by 30-06-2026 but shows 0%, so I have marked construction as behind schedule.
- The amount collected is shown as Rs 14.12 Cr, Rs 8.66 Cr and Rs 12.39 Cr over the three quarters, and it goes down and up, so the figures do not look cumulative.
- The Q1 cost table shows Rs 45.55 Cr spent against an engineer-certified construction estimate of Rs 83.65 Cr.
- The land extent on the khatha is 1 acre 39.25 guntas, about 8,017 sqm, while the registered project area is 6,863 sqm.
- K-RERA lists no complaints on this project and 77 across the promoter's projects.
- No sales agent is registered.
- Collections and sales are as declared by the promoter.
- Court records have not been checked independently.
Verification
Last verified 11 Oct 2026