Paradise at Brigade Cornerstone Utopia
By Brigade Group in Varthur (Bengaluru East), Bengaluru
- Status
- Ready to move
- Type
- Residential
- Locality
- Varthur (Bengaluru East)
- RERA completion
- 14 Jan 2026
- Total homes
- 1,184
- Last verified
- 24 Oct 2026
Summary
Approvals and checks: 3 clear, 3 to check, 1 problem. See the full list.
Construction is 100% complete as of 31 Mar 2026.
Project facts
- Type
- Residential
- RERA number
- PRM/KA/RERA/1251/446/PR/210219/003926
- Project start (per RERA)
- 12 Jan 2021
- Promised possession
- Not available
- RERA completion date
- 14 Jan 2026
- RERA extension
- No extension recorded
- Commencement certificate (CC)
- Not on RERA
- Occupancy certificate (OC)
- Not on RERA
- Land area
- 8.89 acres133 homes per acre
- Open area
- 83.2% of the site
- FAR sanctioned
- Not available
Location
Varthur (Bengaluru East), Bengaluru
Approvals and checks
3 clear, 3 to check, 1 problem
- ✓RERA registrationRegistered
- ✓Building planApproved by BBMP
- !Commencement certificateNot uploaded on RERA
- ✕Occupancy certificateNot on RERA
- –Environmental clearanceNot listed on RERA
- ✓Fire NOCFiled on RERA
- –Airport height (AAI)Not listed on RERA
- –Defence clearance (IAF)Not listed on RERA
- –Draft sale agreementNot recorded
- –Land litigationNot stated
- !Land ownershipJoint development with landowners
- –KhathaNot stated
- !Court-records checkPending
Legal cases
RERA lists 2 complaints on this project, both under enquiry before the Authority, filed by the same complainant (handover, quality and delay compensation).
Legal check not done yet. We have not completed a court-records check for this project.
RERA complaints
2 complaints on this project, 2 still pending.
What complaints were about
One complaint can raise several issues, so issues add up to more than the number of complaints.
By year filed
Disposed Pending
See all 2 complaints
- Refusal of external quality check, breach of agreement clause and Section 18 delay compensation
- Defective AC provision and drainage, rejection of handover and delay compensation (unit L-2548)
Construction and sales
From the promoter’s latest RERA filing, as of 31 Mar 2026.
By tower
Construction complete Homes sold
Over time
Construction complete Homes sold
- Collected from buyers
- Rs 24.22 Cr
- Withdrawn from the RERA account
- Rs 0 Cr
- Total project cost (as declared on RERA)
- Rs 454.56 Cr
Construction timeline
Bars show the promoter’s planned dates on RERA. The vertical line is today. Colour shows progress from the promoter’s latest RERA filing.
100% complete
100% complete
100% complete
100% complete
100% complete
100% complete
100% complete
100% complete
100% complete
100% complete
100% complete
100% complete
100% complete
100% complete
100% complete
Completed In progress Not started
Units
- Total homes
- 1,184
- Towers
- 7
- Floors (tallest tower)
- 27
- Unit types
- Studio; 1 BHK with study; 2 BHK
- Unit sizes (carpet area)
- 323 to 635 sq ft
- Unit mix
- Studio: 600; 1 BHK with study: 280; 2 BHK: 315 (as registered)
Price
- Price range
- Not available
- Price per sq ft
- Not available
Parking
- Covered parking
- Not available
Amenities
Not available
Living here
- Water source
- Other
- Piped gas
- Not available
- Kitchen cabinets and wardrobes
- Not stated
- Clubhouse
- Not available
Promoter and land
- Builder (brand)
- Brigade Group
- Registered promoter
- Mysore Projects Private Limited
- Land owner
- Cornerstone Bay East Developers Private Limited; M. Prasad; G. Narayanappa
- Land arrangement
- Joint development (JDA)
Promoter complaints
- Complaints on the promoter (total)
- 21
- Complaints on the promoter (pending)
- Not available
Sources
Karnataka RERA project page PRM/KA/RERA/1251/446/PR/210219/003926 (registration tabs, Uploaded Documents tab, Complaints tab and the quarterly updates for Q3 2025-26 and Q4 2025-26, checked 24 Oct 2026).
Things to know
- RERA lists this as a Mixed Development (residential, retail and commercial) registration; this record covers the homes in Towers F to L as reported in the quarterly updates.
- The launch date is the project start date declared on RERA (12 Jan 2021).
- The registration lists 1,195 inventory units (474 + 24 + 102 studios of 30 to 32 sq m, 280 one-bedroom with study of 45 sq m, 315 two-bedroom of 59 sq m), while the quarterly updates list 1,184 units across seven towers (1,161 booked, 23 available); the 11-unit difference is shown as filed.
- Both quarterly updates report 100% completion in every tower and every schedule item, with the last item planned to end on 14 Jan 2026, the registered completion date.
- No extension is recorded on RERA.
- Status is shown as Ready to move because construction is reported 100% complete and a complaint on RERA refers to handover; the Completion Details tab and any Q1 or Q2 2026-27 update were not seen, so the occupancy certificate is not confirmed here.
- The land is held under a Joint Development Agreement with Cornerstone Bay East Developers Private Limited (27.9), M.
- Prasad (1.29) and G.
- Narayanappa (4.31) as listed on RERA (Varthur Village, BBMP).
- The khatha type is not stated.
- The commencement/plan sanction slot holds a BBMP plan sanction letter, so the commencement certificate is shown as not on RERA.
- Fire NOC, conversion order, JDA and encumbrance certificate are uploaded.
- Water and utilities are listed as self development.
- The land area is the total area of land declared (35,968 sq m).
- The 82 parking spaces are those declared for sale; covered parking in the quarterly updates is not summed here.
- Collections reported were Rs 62.18 Cr (Q3 2025-26) and Rs 24.22 Cr (Q4 2025-26), with nothing withdrawn from the RERA account in either quarter.
- RERA's Complaints tab (checked 24 Oct 2026) shows 2 complaints on this project, both under enquiry before Authority Bench 6 and filed by the same complainant, and 21 on the promoter; how many of those are pending is not shown.
- Amenities are not stated in the pages seen.
Verification
Last verified 24 Oct 2026