Godrej Woodscapes Phase 2
By Godrej Properties in Budigere Cross, Bengaluru, 560049
- Status
- Under construction
- Type
- Residential
- Locality
- Budigere Cross
- RERA completion
- 1 Jun 2030
- Total homes
- 232
- Last verified
- 4 Oct 2026
Summary
Approvals and checks: 8 clear, 2 to check, 0 problems. See the full list.
Construction is 25% complete as of 30 Jun 2026.
Project facts
- Type
- Residential
- RERA number
- PRM/KA/RERA/1251/446/PR/170524/006888
- Project start (per RERA)
- 1 Jun 2024
- Promised possession
- Not available
- RERA completion date
- 1 Jun 2030
- RERA extension
- No extension recorded
- Commencement certificate (CC)
- Not on RERA
- Occupancy certificate (OC)
- Not yet due
- Land area
- 6.01 acres39 homes per acre
- Open area
- 94.8% of the site
- FAR sanctioned
- Not available
Location
Budigere Cross, Bengaluru, 560049
Approvals and checks
8 clear, 2 to check, 0 problems
- ✓RERA registrationRegistered
- ✓Building planApproved by BDA
- !Commencement certificateNot uploaded on RERA
- –Occupancy certificateDue at completion
- –Environmental clearanceNot listed on RERA
- ✓Fire NOCFiled on RERA
- ✓Airport height (AAI)Filed on RERA
- –Defence clearance (IAF)Not listed on RERA
- ✓Draft sale agreementPublished on RERA
- ✓Land litigationNone declared by promoter
- ✓Land ownershipPromoter's own land
- ✓KhathaE Khatha
- !Court-records checkPending
Legal cases
The promoter declares no litigation on the land, khatha or project, with a non-litigation affidavit uploaded. Two RERA complaints have been filed against this project, in August and November 2024, about a refund of a booking amount and unfair clauses in the draft agreement. Both are disposed, by Authority Bench 4. The outcomes are not shown on the page. We have not yet done a court-records check. Last checked: 4 Oct 2026.
Legal check not done yet. We have not completed a court-records check for this project.
RERA complaints
2 complaints on this project.
What complaints were about
One complaint can raise several issues, so issues add up to more than the number of complaints.
By year filed
Disposed Pending
See all 2 complaints
- Unfair clauses in the draft agreement
- Refund of booking amount
Construction and sales
From the promoter’s latest RERA filing, as of 30 Jun 2026.
By tower
Construction complete Homes sold
Over time
Construction complete Homes sold
- Collected from buyers
- Rs 5.36 Cr
- Withdrawn from the RERA account
- Rs 3.14 Cr
- Total project cost (as declared on RERA)
- Rs 315.96 Cr
- Quarterly updates
- Up to dateLatest filed 10 Jul 2026
Construction timeline
Bars show the promoter’s planned dates on RERA. The vertical line is today. Colour shows progress from the promoter’s latest RERA filing.
RERA items combined: earthwork and levelling (96% done); foundation footing (96% done). Both were due to finish by 29 Aug 2025 and 28 Oct 2025.
RERA items combined: retaining wall (12%); up to plinth level (12%); sub-structure flooring for parking floors (14%). The retaining wall and plinth were due by 11 Jan and 10 Feb 2026.
RERA items combined: RCC or MS framed structure (16%, planned 11 Jan 2026 to 13 Jul 2028); masonry (0%). Slabs are complete to the 2nd floor, with the 3rd under way, in both towers.
RERA items combined: basic water, sanitary and electrical work; plastering; joinery; flooring and tiles; railing; finishing fittings; painting; fire fittings; weatherproofing; elevation. All at 0%.
Internal and external works including landscaping, at 0%. The planned end, 5 Jun 2030, is after the RERA completion date of 1 Jun 2030.
Completed In progress Not started
Units
- Total homes
- 232
- Towers
- 2
- Floors (tallest tower)
- 37
- Unit types
- 1 BHK, 2 BHK, 3 BHK, 3.5 BHK, 4 BHK
- Unit sizes (carpet area)
- 1,106 to 1,983 sq ft
- Unit mix
- 1 BHK: 80; 4 BHK: 76; 3 BHK: 71; 2 BHK: 4; 3.5 BHK: 1
Price
- Price range
- Not available
- Price per sq ft
- Not available
Parking
- Covered parking
- 464 spaces2 spaces per home
Amenities
- Clubhouse
- Swimming pool
- Gym
- Indoor sports
- Outdoor sports
- Parks
- CCTV
- Power backup
- Sewage treatment plant
- Rainwater harvesting
- Renewable energy
Living here
- Water source
- Other
- Piped gas
- No
- Kitchen cabinets and wardrobes
- Not included, buyer fits them
- Clubhouse
- 80,729 sq ft348 sq ft per home
Promoter and land
- Builder (brand)
- Godrej Properties
- Registered promoter
- Godrej Properties Limited
- Land owner
- Godrej Properties Limited
- Land arrangement
- Own land
Sources
Karnataka RERA project page for Godrej Woodscapes Phase 2 (registration PRM/KA/RERA/1251/446/PR/170524/006888; checked 4 Oct 2026) and its Q3 2025-26, Q4 2025-26 and Q1 2026-27 quarterly updates (filed 14 Jan, 13 Apr and 10 Jul 2026; latest progress as of 30 Jun 2026).
Things to know
- This is Phase 2 of the Godrej Woodscapes development, two towers (P and Q) with 232 homes on 6.01 acres.
- It sits on the same survey numbers (3 and 4, Konadasapura) and uses the same BDA plan number as Phase 1, and its amenity areas on RERA are identical to Phase 1's, so the amenities appear to be shared.
- The promoter's list on RERA shows a third registration for the development, Boulevard at Godrej Woodscapes, that is not part of this record.
- The launch date is the project start date declared on RERA, and no extension is shown.
- Unit sizes are RERA carpet areas from the flat-wise table. 80 homes are listed as 1 BHK but have carpet areas of only 10.1 to 11.9 sq m, so the smallest and largest sizes shown leave them out.
- The commencement certificate slot holds a file named 'Work Order - DP - BDA', which is not a commencement certificate.
- The quarterly updates show KSPCB and environmental clearance (MoEF) as approved, but both document slots say Not available.
- Only a SEIAA meeting-minutes file is uploaded.
- A fire NOC, an agreement for sale proforma and an allotment letter proforma are uploaded.
- Water comes from the local panchayat.
- The filing reports 25% overall completion, but work-wise progress in the same filing is lower: RCC frame 16%, plinth level 12%, retaining wall 12%, foundations 96%.
- Slabs are complete to the 2nd floor, with the 3rd under way, in both towers.
- The planned end dates for earthwork, foundations, plinth and the retaining wall have passed.
- The last planned milestone ends on 5 Jun 2030, after the RERA completion date of 1 Jun 2030.
- The filing reports Rs 5.76 Cr of principal and interest payable to an NBFC, for which nothing was budgeted, and consultants' fees of Rs 12.62 Cr against Rs 7.63 Cr budgeted.
- Construction cost spent is Rs 29.10 Cr of the engineer-certified Rs 211.71 Cr.
- Bookings have stayed at 220 of 232 homes in all three filings.
- Buyer advances and RERA account withdrawals do not move consistently from one filing to the next, so they appear to be reported on different bases.
- The 'actual' start dates for most works equal the planned dates and are not used.
- The K-RERA complaints tab lists two complaints on this project, checked 4 Oct 2026.
Verification
Last verified 4 Oct 2026