Garden Breeze @ The Prestige City
By Prestige Group in Sarjapur (The Prestige City, Ittangur), Bengaluru, 562125
- Status
- Under construction
- Type
- Residential
- Locality
- Sarjapur (The Prestige City, Ittangur)
- RERA completion
- 30 Nov 2030
- Total homes
- 655
- Last verified
- 14 Oct 2026
Summary
Approvals and checks: 9 clear, 2 to check, 0 problems. See the full list.
Project facts
- Type
- Residential
- RERA number
- PRM/KA/RERA/1251/308/PR/080926/008919
- Project start (per RERA)
- 1 Sept 2026
- Promised possession
- Not available
- RERA completion date
- 30 Nov 2030
- RERA extension
- No extension recorded
- Commencement certificate (CC)
- Received
- Occupancy certificate (OC)
- Not yet due
- Land area
- 10 acres66 homes per acre
- Open area
- 60.2% of the site
- FAR sanctioned
- 2.25
Location
Sarjapur (The Prestige City, Ittangur), Bengaluru, 562125
Approvals and checks
9 clear, 2 to check, 0 problems
- ✓RERA registrationRegistered
- ✓Building planApproved
- ✓Commencement certificateReceived
- –Occupancy certificateDue at completion
- ✓Environmental clearanceFiled on RERA
- ✓Fire NOCFiled on RERA
- ✓Airport height (AAI)Filed on RERA
- –Defence clearance (IAF)Not listed on RERA
- ✓Draft sale agreementPublished on RERA
- ✓Land litigationNone declared by promoter
- !Land ownershipJoint development with landowners
- ✓KhathaE Khatha
- !Court-records checkPending
Legal cases
No litigation is declared on the land or the project on RERA (registration tabs, checked 14 Oct 2026). A notarised non-litigation affidavit and an advocate's search report are uploaded.
Legal check not done yet. We have not completed a court-records check for this project.
RERA complaints
No complaints recorded on this project.
Construction and sales
From the promoter’s latest RERA filing.
By tower
Construction complete Homes sold
- Total project cost (as declared on RERA)
- Rs 927.7 Cr
Units
- Total homes
- 655
- Towers
- 4
- Floors (tallest tower)
- 30
- Unit types
- 2 BHK, 3 BHK, 4 BHK
- Unit sizes (carpet area)
- 670 to 1,824 sq ft
- Unit mix
- 2 BHK: 239; 3 BHK: 413; 4 BHK: 3
Price
- Price range
- Not available
- Price per sq ft
- Not available
Parking
- Covered parking
- 891 spaces1.36 spaces per home
Amenities
- Clubhouse
- Community hall
- Outdoor sports
- Indoor sports
- Swimming pool
- Gym
- Parks
- CCTV
- Power backup
Living here
- Water source
- Borewell
- Piped gas
- No
- Kitchen cabinets and wardrobes
- Not stated
- Clubhouse
- 27,051 sq ft41 sq ft per home
Promoter and land
- Builder (brand)
- Prestige Group
- Registered promoter
- Prestige Projects Private Limited
- Land owner
- H. V. Dharmesh (60% share; survey nos. 99/2, 99/3, 100/4); Nalini Dharmesh (60% share; survey nos. 100/3, 100/5)
- Land arrangement
- Joint development (JDA)
Promoter complaints
- Complaints on the promoter (total)
- 13
- Complaints on the promoter (pending)
- Not available
Sources
Karnataka RERA project page PRM/KA/RERA/1251/308/PR/080926/008919 (registration tabs, Complaints tab, Uploaded Documents tab and Quarterly Updates tab, checked 14 Oct 2026).
Things to know
- The launch date is the project start date declared on RERA (1 Sep 2026); RERA approved the registration on 8 Sep 2026.
- The commencement certificate slot on RERA shows 'NA', but a file named 'Commencement Certificate (CC)' is listed in the uploaded documents (1 Sep 2026), so it is shown as received.
- The approved plan is from the Anekal Planning Authority (plan no. 551/2026-27, 14 Aug 2026).
- All 5 survey numbers are listed as JDA land and the JDAs are shown as registered on 16 Oct 2025; RERA shows an e-Khatha for them.
- RERA lists the building contractor as Larsen & Toubro Limited.
- Land area is the total area of land declared (40,468 sq m).
- Unit sizes are the carpet areas in the RERA unit list (62 to 169 sq m): 239 units of 2 BHK, 413 of 3 BHK and 3 of 4 BHK.
- RERA lists 891 covered and 35 open parking spaces, but the tower-level figures add up to 655.
- Source of water is a borewell.
- The electricity NOC slot shows 'NA' (a BESCOM application and fee receipt are uploaded).
- The pollution board slot holds a KSPCB consent-for-establishment file and the environmental clearance slot holds an MoEF file.
- Several uploaded files on RERA carry the name of the sister project Aston Park (the 'Form 7' and 'Quarterly report of the previous project' files).
- The Quarterly Updates tab has no entries yet, so progress, bookings, collections and withdrawals are not reported; the first update is due after the quarter ending 30 Sep 2026.
- RERA's Complaints tab (checked 14 Oct 2026) shows 0 complaints on this project and 13 on the promoter; how many of those 13 are pending is not shown.
- Kitchen cabinets and wardrobes are not stated on RERA.
Verification
Last verified 14 Oct 2026