Fernvale @ The Prestige City
By Prestige Group in Sarjapur (The Prestige City, Valagere Kallahalli), Bengaluru, 562125
- Status
- Under construction
- Type
- Residential
- Locality
- Sarjapur (The Prestige City, Valagere Kallahalli)
- RERA completion
- 31 Mar 2030
- Total homes
- 387
- Last verified
- 14 Oct 2026
Summary
Approvals and checks: 8 clear, 3 to check, 0 problems. See the full list.
Construction is 9% complete as of 30 Jun 2026.
Project facts
- Type
- Residential
- RERA number
- PRM/KA/RERA/1251/308/PR/110326/008519
- Project start (per RERA)
- 1 Apr 2026
- Promised possession
- Not available
- RERA completion date
- 31 Mar 2030
- RERA extension
- No extension recorded
- Commencement certificate (CC)
- Not on RERA
- Occupancy certificate (OC)
- Not yet due
- Land area
- 4.99 acres78 homes per acre
- Open area
- 88.4% of the site
- FAR sanctioned
- 2.74
Location
Sarjapur (The Prestige City, Valagere Kallahalli), Bengaluru, 562125
Approvals and checks
8 clear, 3 to check, 0 problems
- ✓RERA registrationRegistered
- ✓Building planApproved
- !Commencement certificateNot uploaded on RERA
- –Occupancy certificateDue at completion
- ✓Environmental clearanceFiled on RERA
- ✓Fire NOCFiled on RERA
- ✓Airport height (AAI)Filed on RERA
- –Defence clearance (IAF)Not listed on RERA
- ✓Draft sale agreementPublished on RERA
- ✓Land litigationNone declared by promoter
- !Land ownershipJoint development with landowners
- ✓KhathaE Khatha
- !Court-records checkPending
Legal cases
No litigation is declared on the land or the project on RERA (registration tabs, checked 14 Oct 2026). Legal opinions and encumbrance certificates are uploaded for the survey numbers.
Legal check not done yet. We have not completed a court-records check for this project.
RERA complaints
No complaints recorded on this project.
Construction and sales
From the promoter’s latest RERA filing, as of 30 Jun 2026.
By tower
Construction complete Homes sold
Over time
Construction complete Homes sold
- Collected from buyers
- Rs 24.4 Cr
- Withdrawn from the RERA account
- Rs 28.49 Cr
- Total project cost (as declared on RERA)
- Rs 476.65 Cr
- Quarterly updates
- Up to dateLatest filed 15 Jul 2026
Construction timeline
Bars show the promoter’s planned dates on RERA. The vertical line is today. Colour shows progress from the promoter’s latest RERA filing.
50% complete
35% complete
0% complete
0% complete
0% complete
0% complete
0% complete
0% complete
0% complete
0% complete
0% complete
0% complete
0% complete
0% complete
0% complete
0% complete
0% complete
0% complete
Completed In progress Not started
Units
- Total homes
- 387
- Towers
- 2
- Floors (tallest tower)
- 28
- Unit types
- 2 BHK, 3 BHK
- Unit sizes (carpet area)
- 700 to 1,250 sq ft
- Unit mix
- 2 BHK: 167; 3 BHK: 220
Price
- Price range
- Not available
- Price per sq ft
- Not available
Parking
- Covered parking
- 465 spaces1.2 spaces per home
Amenities
- Clubhouse
- Community hall
- Outdoor sports
- Indoor sports
- Swimming pool
- Gym
- Parks
- CCTV
- Power backup
Living here
- Water source
- Borewell
- Piped gas
- No
- Kitchen cabinets and wardrobes
- Not stated
- Clubhouse
- 19,813 sq ft51 sq ft per home
Promoter and land
- Builder (brand)
- Prestige Group
- Registered promoter
- Prestige Projects Private Limited
- Land owner
- KLSR Urban Properties Private Limited (67% share); K. S. Venu Babu (33% share, survey nos. 68/1 and 68/2)
- Land arrangement
- Joint development (JDA)
Promoter complaints
- Complaints on the promoter (total)
- 13
- Complaints on the promoter (pending)
- Not available
Sources
Karnataka RERA project page PRM/KA/RERA/1251/308/PR/110326/008519 (registration tabs, Complaints tab, Uploaded Documents tab and the quarterly updates for Q4 2025-26 and Q1 2026-27, checked 14 Oct 2026).
Things to know
- The launch date is the project start date declared on RERA (1 Apr 2026); RERA approved the registration on 11 Mar 2026.
- The commencement certificate and approved building plan slots on RERA show 'NA'; a building licence and an approved plan from the Anekal Planning Authority (plan no.
- CC/1458/2025-26, 5 Mar 2026) are uploaded, so the commencement certificate is shown as not on RERA.
- All 16 survey numbers are listed as JDA land and the JDAs are shown as registered between 11 Aug 2025 and 11 Dec 2025; RERA shows an e-Khatha for them.
- The Land Details tab shows KLSR Urban Properties Private Limited with a 67% share and K.
- S.
- Venu Babu with a 33% share in survey nos. 68/1 and 68/2.
- RERA lists the building contractor as Larsen & Toubro Limited.
- Land area is the total area of land declared (20,183 sq m).
- Unit sizes are the carpet areas in the RERA unit list (65 to 116 sq m): 167 units of 2 BHK and 220 of 3 BHK.
- RERA lists 465 covered and 75 open parking spaces, but the tower-level figures add up to 387.
- Source of water is a borewell.
- The electricity NOC slot shows 'NA' (a BESCOM acknowledgement and fee receipt are uploaded).
- The pollution board slot holds a KSPCB consent-for-establishment file (named 10 Dec 2025) and the environmental clearance slot holds an MoEF file.
- Several uploaded files on RERA carry the name of the sister project Aston Park (for example the 'Quarterly Report' and 'Form 7' files).
- In both quarterly updates the tower-level progress is 0% while the overall progress is 4% (Q4 2025-26, filed 15 Apr 2026) and 9% (Q1 2026-27, filed 15 Jul 2026); the schedule shows earthwork and foundation footing under way.
- In Q1 2026-27 the amount withdrawn (Rs 28.49 Cr) is higher than the amount collected (Rs 24.40 Cr) as filed.
- RERA's Complaints tab (checked 14 Oct 2026) shows 0 complaints on this project and 13 on the promoter; how many of those 13 are pending is not shown.
- Kitchen cabinets and wardrobes are not stated on RERA.
- The Q2 2026-27 update is not yet due.
Verification
Last verified 14 Oct 2026