Fairmont at Brigade Orchards
By Brigade Group in Devanahalli, Bengaluru, 562110
- Status
- Under construction
- Type
- Residential
- Locality
- Devanahalli
- RERA completion
- 31 Dec 2027
- Total homes
- 92
- Last verified
- 5 Oct 2026
Summary
Approvals and checks: 9 clear, 2 to check, 0 problems. See the full list.
Construction is 99% complete as of 30 Jun 2026.
Project facts
- Type
- Residential
- RERA number
- PRM/KA/RERA/1250/303/PR/231123/006424
- Project start (per RERA)
- 1 Dec 2023
- Promised possession
- Not available
- RERA completion date
- 31 Dec 2027
- RERA extension
- No extension recorded
- Commencement certificate (CC)
- Not on RERA
- Occupancy certificate (OC)
- Not yet due
- Land area
- 1.71 acres54 homes per acre
- Open area
- 61.8% of the site
- FAR sanctioned
- 2.39
Location
Devanahalli, Bengaluru, 562110
Approvals and checks
9 clear, 2 to check, 0 problems
- ✓RERA registrationRegistered
- ✓Building planApproved
- !Commencement certificateNot uploaded on RERA
- –Occupancy certificateDue at completion
- ✓Environmental clearanceFiled on RERA
- ✓Fire NOCFiled on RERA
- ✓Airport height (AAI)Filed on RERA
- –Defence clearance (IAF)Not listed on RERA
- ✓Draft sale agreementPublished on RERA
- ✓Land litigationNone declared by promoter
- ✓Land ownershipPromoter's own land
- ✓KhathaE Khatha
- !Court-records checkPending
Legal cases
The promoter declares no litigation on the land, khatha or project, with a non-litigation affidavit uploaded, and reports none in its quarterly updates. An advocate's title report is also uploaded. The RERA complaints tab is empty on the page, so no complaints are listed against this project. We have not yet done a court-records check. Last checked: 5 Oct 2026.
Legal check not done yet. We have not completed a court-records check for this project.
RERA complaints
No complaints recorded on this project.
Construction and sales
From the promoter’s latest RERA filing, as of 30 Jun 2026.
By tower
Construction complete Homes sold
Over time
Construction complete Homes sold
- Collected from buyers
- Rs 7.02 Cr
- Withdrawn from the RERA account
- Rs 0.79 Cr
- Total project cost (as declared on RERA)
- Rs 78.67 Cr
- Quarterly updates
- Up to dateLatest filed 15 Jul 2026
Construction timeline
Bars show the promoter’s planned dates on RERA. The vertical line is today. Colour shows progress from the promoter’s latest RERA filing.
RERA items combined: earthwork and levelling (100% done, 1 to 31 Dec 2023); foundation footing (100% done, 1 Jan to 31 May 2024).
RERA items combined: up to plinth level (100%); retaining wall (100%); sub-structure flooring for parking floors (100%). The page gives the flooring's planned dates as 1 Dec 2024 to 31 May 2024, an end before the start; the work was done 1 Mar to 23 Jun 2025.
RERA items combined: RCC or MS framed structure (100%, finished 11 Jun 2025 against a planned 8 Jul 2025); masonry (100%, finished 30 Sep 2025 against a planned 30 Oct 2025).
RERA items combined: plastering (100%); joinery (100%); basic water, sanitary and electrical work (100%); flooring and tiles (100%); railing (100%); finishing fittings (80%); painting (90%); fire fittings (100%); weatherproofing (100%); elevation (95%); wardrobes, showcase, kitchen cabinets and puja work (0%, planned from 1 Jan 2027).
Internal and external works including landscaping, at 95% (80% in the previous update and 10% in the one before). The planned end is the RERA completion date, 31 Dec 2027.
Completed In progress Not started
Units
- Total homes
- 92
- Towers
- 2
- Floors (tallest tower)
- 8
- Unit types
- 3 BHK, 4 BHK
- Unit sizes (carpet area)
- 1,243 to 1,449 sq ft
- Unit mix
- 3 BHK: 60; 4 BHK: 32
Price
- Price range
- Not available
- Price per sq ft
- Not available
Parking
- Covered parking
- 114 spaces1.24 spaces per home
Amenities
- Community hall
- Gym
- Sewage treatment plant
- Rainwater harvesting
Living here
- Water source
- Tanker
- Piped gas
- No
- Kitchen cabinets and wardrobes
- Yes
- Clubhouse
- Not available
Promoter and land
- Builder (brand)
- Brigade Group
- Registered promoter
- BCV Developers Pvt Ltd
- Land owner
- BCV Developers Pvt Ltd
- Land arrangement
- Own land
Sources
- Karnataka RERA project page for Fairmont at Brigade Orchards (registration PRM/KA/RERA/1250/303/PR/231123/006424): the Promoter Details, Project Details and Project Documents tabs, and the quarterly updates for Q3 2025-26 (filed 14 Jan 2026), Q4 2025-26 (filed 15 Apr 2026) and Q1 2026-27 (filed 15 Jul 2026); checked 5 Oct 2026.
- The complaints tab is empty on the page, so no complaints are listed against this project.
- The earlier quarterly updates have not been checked.
Things to know
- The launch date is the project start date declared on RERA (1 Dec 2023) and the RERA completion date is the proposed completion date at registration (31 Dec 2027); the page has no Project Extension Details tab and the dates table lists no extension.
- There are two towers of 8 floors each (plus one stilt and one basement level) with 46 homes each, 92 in all: 60 three-bedroom and 32 four-bedroom homes, each with a servant room.
- Unit sizes are RERA carpet areas (115.5 to 134.58 sq m, or 1,243 to 1,449 sq ft) and exclude balconies and terraces.
- Land area is the RERA total of 6,936 sq m (1.71 acres), of which 4,286 sq m is open area.
- Total project cost is the CA-certified cost at registration: Rs 8.03 Cr for land plus Rs 70.64 Cr for layout development.
- The promoter owns the land (100%, survey number 37/2(P), E Khatha); no JDA is registered, but a joint venture agreement file is uploaded.
- RERA lists 114 covered and 10 open parking spaces.
- The water source on RERA is private tankers, and the water NOC slot holds a Central Ground Water Authority file.
- The approving authority is listed on RERA only as 'Local Planing Authority' (plan number STRRPA/TP/CC/134/2022-23), so it is shown as Other.
- The commencement certificate slot holds a file named 'Plan Sanction', so the CC is shown as not on RERA; a file named 'Building Licence' is listed separately under Enquired Documents (uploaded 21 Nov 2023).
- The quarterly updates list water supply and sewage board, KSPCB (two entries), BESCOM, fire, airport authority and BSNL approvals as approved, with application dates between 2011 and 2022; the electricity, groundwater, pollution board, environmental clearance and telecom NOC files are named for Brigade Orchards, the township, and may cover more than this project.
- RERA lists no clubhouse, swimming pool, parks, CCTV, power backup or piped gas for this project; it lists a community hall (138 sq m) and a gym (48 sq m).
- In all three updates the community hall, gym and sewage treatment plant are at 0%, and wardrobe and kitchen cabinet work (shown as included, since RERA lists it as applicable) has not started; it is planned from January 2027.
- Completion: the 99% is the project-level figure on RERA, which is cost-based.
- The same filing puts both towers at 81%, with floors from 70% (top) to 95% (ground).
- The project figure was 88% in Q3 2025-26 when the towers were at 64%, and 99% in Q4 2025-26 when they were at 70%.
- The cost tables in the three updates are not consistent with each other (actual site overhead of Rs 50.75 Cr in Q4 against Rs 3.31 Cr estimated; actual construction cost of Rs 11.64 Cr, Rs 8.44 Cr and Rs 1.29 Cr in the three quarters), so read the cost-based figure with care.
- Buyer collections and withdrawals are as filed in the latest update (Rs 7.02 Cr and Rs 0.79 Cr).
- The three updates show Rs 2.83 Cr, Rs 47.95 Cr and Rs 7.02 Cr collected, so they may not be running totals.
- All 92 homes are shown as booked in the latest update (one 3 BHK in Tower-1 was shown as unbooked in the previous one).
- Construction is shown as on track: every item due by 30 Jun 2026 is reported complete.
- The updates report no litigation on the project, no change to approvals and no association of allottees formed yet.
- The occupancy certificate is not yet due.
- The map position is the latitude and longitude given on RERA.
Verification
Last verified 5 Oct 2026