Embassy Lake Terraces
By Embassy Group in Hebbal, Bengaluru
- Status
- Ready to move
- Type
- Residential
- Locality
- Hebbal
- RERA completion
- 30 Jun 2019
- Total homes
- 467
- Last verified
- 1 Oct 2026
Summary
Approvals and checks: 8 clear, 2 to check, 0 problems. See the full list.
Construction is 100% complete as of 30 Jun 2023.
Project facts
- Type
- Residential
- RERA number
- PRM/KA/RERA/1251/309/PR/171016/000602
- Project start (per RERA)
- 10 Sept 2012
- Promised possession
- Not available
- RERA completion date
- 30 Jun 2019
- RERA extension
- Extended till 31 Mar 2023
- Commencement certificate (CC)
- Received
- Occupancy certificate (OC)
- Received
- Land area
- 16.38 acres29 homes per acre
- Open area
- 76.1% of the site
- FAR sanctioned
- Not available
Location
Hebbal, Bengaluru
Approvals and checks
8 clear, 2 to check, 0 problems
- ✓RERA registrationRegistered
- ✓Building planApproved by BBMP
- ✓Commencement certificateReceived
- ✓Occupancy certificateReceived
- ✓Environmental clearanceFiled on RERA
- ✓Fire NOCFiled on RERA
- ✓Airport height (AAI)Filed on RERA
- –Defence clearance (IAF)Not listed on RERA
- ✓Draft sale agreementPublished on RERA
- –Land litigationNot stated
- !Land ownershipJoint development with landowners
- –KhathaNot stated
- !Court-records checkPending
Legal cases
Seven complaints have been filed against the project on RERA since June 2022, all about delayed or incomplete handover, compensation, or carpet area and finish. Six are disposed (four by the Authority, two by the Adjudicating Officer) and one, filed in December 2024, is posted for orders before Authority Bench 4. The outcomes of the disposed complaints are not shown on the page. Last checked: 1 Oct 2026.
Legal check not done yet. We have not completed a court-records check for this project.
RERA complaints
7 complaints on this project, 1 still pending.
What complaints were about
One complaint can raise several issues, so issues add up to more than the number of complaints.
By year filed
Disposed Pending
See all 7 complaints
- Project not completed, leaving a semi-finished apartment; redress sought for financial hardship, misrepresentation and breach of agreement
- Possession given with deficient carpet area and a semi-finished apartment; misrepresentation and breach of agreement
- Possession not handed over on time; misrepresentation and breach of agreement
- Full compensation and unit handover
- Delay in completion of the project
- Compensation for delay and for handing over the apartment with basic amenities
- Delay in handing over the apartment; breach of a settlement agreement dated 3 Oct 2020
Construction and sales
From the promoter’s latest RERA filing, as of 30 Jun 2023.
- Collected from buyers
- Rs 1,040.24 Cr
- Total project cost (as declared on RERA)
- Rs 2,396.95 Cr
Construction timeline
Bars show the promoter’s planned dates on RERA. The vertical line is today. Colour shows progress from the promoter’s latest RERA filing.
Occupancy certificate received 16 May 2022. Promoter applied for completion on 30 Jun 2023, 4 years after the original completion date (30 Jun 2019) and 3 months after the last extension date shown (31 Mar 2023). The page does not show whether K-RERA has accepted the completion.
Completed In progress Not started
Units
- Total homes
- 467
- Towers
- 9
- Floors (tallest tower)
- Not available
- Unit types
- Not available
- Unit sizes (carpet area)
- Not available
- Unit mix
- Not available
Price
- Price range
- Not available
- Price per sq ft
- Not available
Parking
- Covered parking
- Not available
Amenities
Not available
Living here
- Water source
- Not available
- Piped gas
- Not available
- Kitchen cabinets and wardrobes
- Not available
- Clubhouse
- Not available
Promoter and land
- Builder (brand)
- Embassy Group
- Registered promoter
- Embassy Property Development Private Limited
- Land owner
- Not available
- Land arrangement
- Joint development (JDA)
Promoter complaints
- Complaints on the promoter (total)
- 7
- Complaints on the promoter (pending)
- 1
Sources
Karnataka RERA project page for Embassy Lake Terraces (registration PRM/KA/RERA/1251/309/PR/171016/000602, extension EX/PRM/KA/RERA/1251/309/PR/191130/000602), including its Extension Details and Completion Details tabs; checked 1 Oct 2026.
Things to know
- This is an older-format RERA page, so unit types, sizes, floors, amenities, prices, land owners and the pincode are not on it and are left blank.
- The launch date is the project start date declared on RERA.
- The RERA completion date is the date at registration (30 Jun 2019).
- Extensions listed: Section 6 (to 30 Jun 2020; applied 4 Jun 2019, approved 30 Nov 2019; delay reason given as 'others'; the application records no consent of two-thirds of allottees and no compensation to buyers), Covid (to 30 Mar 2021) and a further extension (to 31 Mar 2023).
- Files named 'CC+ PARTIAL OC' and 'Objection documents in Embassy Lake Terracess' are uploaded with the extension application; the page does not say who raised the objections.
- The Completion Details tab says the promoter applied for completion on 30 Jun 2023 and answers No to whether the project was completed within the stipulated period; the page does not show whether K-RERA has accepted the completion.
- It records an occupancy certificate received on 16 May 2022 (the file name is plural, so it may hold several certificates; which towers they cover is not stated).
- Also uploaded: structural stability, architect, chartered accountant and engineer completion certificates, the promoter's completion affidavit, and a KSPCB consent to operate dated 31 Oct 2018.
- A fire NOC that expired on 16 Feb 2017 is shown as not renewed in the extension application; a fire NOC dated 27 Jul 2020 is uploaded with the completion documents, with no validity dates.
- The fields for the lift operation certificate, external infrastructure, and handover of common areas, amenities and the undivided share of land to the association are empty.
- The older registration page still shows Ongoing, 77% developed and delayed by 11 months; these figures are undated and superseded by the completion filing.
- Sales (356 of 467 flats sold, 111 unsold) and buyer collections (Rs 1,040.24 Cr) are as stated in the completion filing and are not current.
- The completion filing reports Rs 2,620.57 Cr spent, Rs 223.62 Cr above the declared total project cost of Rs 2,396.95 Cr (land cost Rs 861.64 Cr included), and reports that a loan was raised.
- Land area is the RERA total of 66,277 sq m (16.38 acres); the project description says 14.5 acres.
- The map position is the average of the boundary points listed on RERA (the west longitude there repeats the latitude and was ignored).
- A file named 'Commencement certificate' and a Joint Development Agreement file are uploaded.
- Complaints are as listed on the K-RERA complaints tab, checked 1 Oct 2026.
- The promoter declares four earlier projects: Embassy Oasis and Embassy Pristine (completed) and Embassy Boulevard and Embassy Grove (shown as ongoing).
Verification
Last verified 1 Oct 2026