DRK Bellagio
By DRK Projects in Kithaganur, Bidarahalli Hobli (Bengaluru East), Bengaluru, 560048
- Status
- Under construction
- Type
- Residential
- Locality
- Kithaganur, Bidarahalli Hobli (Bengaluru East)
- RERA completion
- 30 Jun 2028
- Total homes
- 76
- Last verified
- 24 Oct 2026
Summary
Approvals and checks: 7 clear, 3 to check, 0 problems. See the full list.
Construction is 8% complete as of 30 Sept 2026.
Project facts
- Type
- Residential
- RERA number
- PRM/KA/RERA/1251/446/PR/200225/007518
- Project start (per RERA)
- 10 Dec 2024
- Promised possession
- Not available
- RERA completion date
- 30 Jun 2028
- RERA extension
- No extension recorded
- Commencement certificate (CC)
- Not on RERA
- Occupancy certificate (OC)
- Not yet due
- Land area
- 3.12 acres24 homes per acre
- Open area
- 77.1% of the site
- FAR sanctioned
- 1.75
Location
Kithaganur, Bidarahalli Hobli (Bengaluru East), Bengaluru, 560048
Approvals and checks
7 clear, 3 to check, 0 problems
- ✓RERA registrationRegistered
- ✓Building planApproved by BDA
- !Commencement certificateNot uploaded on RERA
- –Occupancy certificateDue at completion
- ✓Environmental clearanceFiled on RERA
- !Fire NOCNot listed on RERA
- –Airport height (AAI)Not listed on RERA
- –Defence clearance (IAF)Not listed on RERA
- ✓Draft sale agreementPublished on RERA
- ✓Land litigationNone declared by promoter
- ✓Land ownershipPromoter's own land
- ✓KhathaE Khatha
- !Court-records checkPending
Legal cases
RERA's Complaints tab (checked 24 Oct 2026) shows no complaints on this project or on the promoter.
Legal check not done yet. We have not completed a court-records check for this project.
RERA complaints
No complaints recorded on this project.
Construction and sales
From the promoter’s latest RERA filing, as of 30 Sept 2026.
By tower
Construction complete Homes sold
Over time
Construction complete Homes sold
- Collected from buyers
- Rs 3.28 Cr
- Withdrawn from the RERA account
- Rs 1.79 Cr
- Total project cost (as declared on RERA)
- Rs 166.93 Cr
Construction timeline
Bars show the promoter’s planned dates on RERA. The vertical line is today. Colour shows progress from the promoter’s latest RERA filing.
100% complete
100% complete
100% complete
85% complete
30% complete
13% complete
10% complete
1% complete
1% complete
1% complete
1% complete
0% complete
0% complete
0% complete
0% complete
0% complete
Completed In progress Not started
Units
- Total homes
- 76
- Towers
- 2
- Floors (tallest tower)
- 4
- Unit types
- Duplex villas; Simplex villas; Row houses
- Unit sizes (carpet area)
- 1,882 to 2,289 sq ft
- Unit mix
- Duplex villas: 24; Simplex villas: 6; Row houses: 46
Price
- Price range
- Not available
- Price per sq ft
- Not available
Parking
- Covered parking
- 159 spaces2.09 spaces per home
Amenities
- Club house
- Community hall
- Outdoor sports
- Indoor sports
- Swimming pool
- Gym
- Parks
- Power backup
- Piped gas
- CCTV
Living here
- Water source
- Other
- Piped gas
- Yes
- Kitchen cabinets and wardrobes
- Not included, buyer fits them
- Clubhouse
- 4,844 sq ft64 sq ft per home
Promoter and land
- Builder (brand)
- DRK Projects
- Registered promoter
- M/s DRK Projects (partnership firm)
- Land owner
- Duddukuri Ravikumar (own land)
- Land arrangement
- Own land
Promoter complaints
- Complaints on the promoter (total)
- 0
- Complaints on the promoter (pending)
- 0
Sources
Karnataka RERA project page PRM/KA/RERA/1251/446/PR/200225/007518 (promoter details, land details, project details, uploaded documents and Complaints tabs, and the quarterly updates for Q3 2025-26, Q4 2025-26, Q1 2026-27 and Q2 2026-27, checked 24 Oct 2026).
Things to know
- The project start date declared on RERA (10 Dec 2024) is shown as the launch date.
- RERA lists 76 homes in two wings: WING-VILLA with 30 villas (24 duplex and 6 simplex, about 175 to 198 sq m carpet, basement plus four levels) and WING-HOUSES with 46 row houses (about 208 to 213 sq m carpet, basement plus two levels).
- Smallest and largest carpet areas are taken from the unit-wise list.
- The land (Sy.
- Nos. 131/7 and 133/4, Kithaganur village, 12,646 sq m) is the land owner's own land, bought by sale deeds and converted to residential use in 2011.
- The land owner, Duddukuri Ravikumar, is also a partner in the promoter firm; no joint development agreement is declared.
- The khatha is an E Khatha issued by PDO Kithaganur (20 Nov 2023) and the promoter declares no land litigation (no-litigation affidavit uploaded).
- The plan was approved by BDA on 24 Oct 2024 (plan number BDA/TP/EM/EO-2/TA-3/North/016/2024-25).
- The commencement certificate slot holds a file named Building License (BDA), which is the plan sanction licence and not a commencement certificate, so it is shown as not on RERA.
- The occupancy certificate is not yet due (RERA completion 30 Jun 2028).
- Land area is the total area declared (12,646 sq m: 9,754 open and 2,892 covered). 159 covered parking spaces are declared on the registration; the quarterly updates show 152 (60 and 92).
- Total project cost is Rs 166.93 Cr: land Rs 70.70 Cr plus layout development Rs 96.23 Cr.
- FAR sanctioned is 1.75.
- Source of water is the local authority (PDO Kithaganur, panchayat water NOC uploaded).
- Uploaded NOCs: BESCOM electricity, panchayat water, a KSPCB NOC and a SEIAA/MoEF NOC.
- Fire force and AAI NOCs are not uploaded; the quarterly updates mark fire and AAI as not applicable.
- The registration's sale agreement slots say not applicable, but the Uploaded Documents tab lists a proforma agreement for sale (with payment schedule) and an allotment letter uploaded on 6 Feb 2025, so a draft sale agreement is shown as on RERA.
- Kitchen cabinets and wardrobes are marked not applicable in the schedule.
- Progress as filed was 4% (Q3 2025-26), 4% (Q4 2025-26), 4% (Q1 2026-27) and 8% (Q2 2026-27, filed 15 Oct 2026).
- At the latest filing the villa wing top level is at 3% (lower levels 66% to 70%) and the row house wing top level at 5% (lower levels 25% to 100%).
- Construction is shown as behind schedule: sub-structure flooring is at 85% against a planned end of 31 Dec 2025, the RCC frame at 30% against 31 Mar 2026, masonry at 13% against 15 Apr 2026 and plastering at 10% against 31 Dec 2025.
- Masonry is planned to start 1 Oct 2024, before the declared project start date.
- Bookings moved from 2 (Q3 2025-26) to 5, 7 and 7 of 76 homes (Q2 2026-27), as filed.
- Buyer collections and withdrawals are shown as filed: Rs 0.25 Cr collected and Rs 0.25 Cr withdrawn (Q3 2025-26, withdrawn equal to collected), Rs 0.91 Cr collected and nothing withdrawn (Q4), Rs 3.82 Cr collected and Rs 1.34 Cr withdrawn (Q1 2026-27) and Rs 3.28 Cr collected and Rs 1.79 Cr withdrawn (Q2 2026-27).
- It is not clear whether the figures are cumulative or for the quarter; the Q2 collection figure is lower than Q1, which would not happen if they were cumulative.
- The Completion Details and Enquired Documents tabs were not seen.
- RERA's Complaints tab (checked 24 Oct 2026) shows no complaints on this project or on the promoter, whose only RERA project this is.
- Quarterly update compliance for earlier quarters not reviewed.
Verification
Last verified 24 Oct 2026