Boulevard at Godrej Woodscapes
By Godrej Properties in Budigere Cross, Bengaluru, 560049
- Status
- Upcoming
- Type
- Commercial
- Locality
- Budigere Cross
- RERA completion
- 30 Jun 2031
- Total units
- 213
- Last verified
- 4 Oct 2026
Summary
Approvals and checks: 9 clear, 2 to check, 0 problems. See the full list.
Project facts
- Type
- Commercial
- RERA number
- PRM/KA/RERA/1251/446/PR/190826/008878
- Project start (per RERA)
- 16 Aug 2026
- Promised possession
- Not available
- RERA completion date
- 30 Jun 2031
- RERA extension
- No extension recorded
- Commencement certificate (CC)
- Not on RERA
- Occupancy certificate (OC)
- Not yet due
- Land area
- 6 acres36 units per acre
- Open area
- 65.6% of the site
- FAR sanctioned
- 3.25
Location
Budigere Cross, Bengaluru, 560049
Approvals and checks
9 clear, 2 to check, 0 problems
- ✓RERA registrationRegistered
- ✓Building planApproved by BDA
- !Commencement certificateNot uploaded on RERA
- –Occupancy certificateDue at completion
- ✓Environmental clearanceFiled on RERA
- ✓Fire NOCFiled on RERA
- ✓Airport height (AAI)Filed on RERA
- –Defence clearance (IAF)Not listed on RERA
- ✓Draft sale agreementPublished on RERA
- ✓Land litigationNone declared by promoter
- ✓Land ownershipPromoter's own land
- ✓KhathaE Khatha
- !Court-records checkPending
Legal cases
No RERA complaints are listed against this project. The promoter declares no litigation on the land, khatha or project, with a non-litigation affidavit and an advocate's title report uploaded. We have not yet done a court-records check. Last checked: 4 Oct 2026.
Legal check not done yet. We have not completed a court-records check for this project.
RERA complaints
No complaints recorded on this project.
Construction timeline
Bars show the promoter’s planned dates on RERA. The vertical line is today. Colour shows progress from the promoter’s latest RERA filing.
RERA items combined: earthwork and levelling (16 Aug to 13 Dec 2026); foundation footing (14 Dec 2026 to 12 Jun 2027). No progress has been reported yet.
RERA items combined: up to plinth level; sub-structure flooring (parking floors); retaining wall. No progress has been reported yet.
RERA items combined: RCC or MS framed structure (28 Jun 2028 to 21 Sep 2029); masonry construction (22 Sep 2029 to 21 Mar 2030).
RERA items combined: plastering; joinery; basic water, sanitary and electrical work; flooring and tiles; railing; finishing fittings; painting; fire fittings; weatherproofing; elevation.
Internal and external works including landscaping. Planned to finish on the RERA completion date, 30 Jun 2031, with no buffer.
Completed In progress Not started
Units
- Total units
- 213
- Towers
- 3
- Floors (tallest tower)
- 3
- Unit types
- Shops
- Unit sizes (carpet area)
- 129 to 4,123 sq ft
- Unit mix
- Shops: 213 (Retail 1: 81, Retail 2: 64, Retail 3: 68)
Price
- Price range
- Not available
- Price per sq ft
- Not available
Parking
- Covered parking
- 435 spaces2.04 spaces per unit
Amenities
- CCTV
- Power backup
Promoter and land
- Builder (brand)
- Godrej Properties
- Registered promoter
- Godrej Properties Limited
- Land owner
- Godrej Properties Limited
- Land arrangement
- Own land
Sources
- Karnataka RERA project page for Boulevard at Godrej Woodscapes (checked 4 Oct 2026).
- The page does not print the registration number; PRM/KA/RERA/1251/446/PR/190826/008878 and the approval date of 19 Aug 2026 come from the promoter's project list on the Godrej Woodscapes Phase 2 page.
Things to know
- This is a commercial and retail project, 213 shops in three retail blocks, not homes.
- Its RERA forms are labelled Phase 3 of Godrej Woodscapes, and it sits on the same Konadasapura survey numbers (3 and 4) as the residential phases.
- The survey numbers show the whole 28-acre parcel bought in 2023.
- This record uses the RERA project area of 24,293 sq m (6.00 acres).
- The launch date is the project start date declared on RERA.
- The project was approved a few weeks ago and no quarterly update has been filed yet, so construction progress is not reported.
- Shop sizes are RERA carpet areas from the unit table, from 12.0 sq m (129 sq ft) to 383.0 sq m (4,123 sq ft).
- The cost of land (Rs 31.57 Cr) and of layout development (Rs 221.15 Cr) add up to Rs 252.72 Cr, while the page states a total project cost of Rs 260.62 Cr, a difference of Rs 7.90 Cr; the stated total is used.
- The commencement certificate slot holds a file named 'Building Plan Letter', and a building licence was uploaded on 14 Aug 2026 in reply to queries from RERA.
- A cost-of-construction breakup, a revised agreement for sale and an engineer's certificate were uploaded in the same reply.
- Only CCTV and power backup are declared as amenities, and the page declares no clubhouse, pool, gym or sports facilities.
- RERA lists 435 covered and 102 open parking spaces.
- The map position is the point given on RERA.
- The K-RERA complaints tab lists no complaints on this project, checked 4 Oct 2026.